Jo-Philipp Wich 654f9c879f switch: the hardware must be up while configuring Since the removal of the interface coldplug hack the timing changed in such a way that eth0 is not up during switch setup, leading to an inaccesible device. Bring up the switch interface before configuring it to mitigate the problem. hace 14 años
..
files 654f9c879f switch: the hardware must be up while configuring Since the removal of the interface coldplug hack the timing changed in such a way that eth0 is not up during switch setup, leading to an inaccesible device. Bring up the switch interface before configuring it to mitigate the problem. hace 14 años
src b9da4dcb6b switch: fix some memory leaks in switch_parse_vlan() hace 14 años
Makefile 654f9c879f switch: the hardware must be up while configuring Since the removal of the interface coldplug hack the timing changed in such a way that eth0 is not up during switch setup, leading to an inaccesible device. Bring up the switch interface before configuring it to mitigate the problem. hace 14 años