723-net-mt7531-ensure-all-MACs-are-powered-down-before-r.patch 932 B

12345678910111213141516171819202122232425262728
  1. From 3fb8841513c4ec3a2e5d366df86230c45f239a57 Mon Sep 17 00:00:00 2001
  2. From: Alexander Couzens <[email protected]>
  3. Date: Sat, 13 Aug 2022 13:08:22 +0200
  4. Subject: [PATCH 03/10] net: mt7531: ensure all MACs are powered down before
  5. reset
  6. The datasheet [1] explicit describes it as requirement for a reset.
  7. [1] MT7531 Reference Manual for Development Board rev 1.0, page 735
  8. Signed-off-by: Alexander Couzens <[email protected]>
  9. ---
  10. drivers/net/dsa/mt7530.c | 4 ++++
  11. 1 file changed, 4 insertions(+)
  12. --- a/drivers/net/dsa/mt7530.c
  13. +++ b/drivers/net/dsa/mt7530.c
  14. @@ -2252,6 +2252,10 @@ mt7530_setup(struct dsa_switch *ds)
  15. return -ENODEV;
  16. }
  17. + /* all MACs must be forced link-down before sw reset */
  18. + for (i = 0; i < MT7530_NUM_PORTS; i++)
  19. + mt7530_write(priv, MT7530_PMCR_P(i), MT7531_FORCE_LNK);
  20. +
  21. /* Reset the switch through internal reset */
  22. mt7530_write(priv, MT7530_SYS_CTRL,
  23. SYS_CTRL_PHY_RST | SYS_CTRL_SW_RST |